Baer Family Farm

Skip to content
  • Robotic Milking Barn Project

The building is done

September 22, 2014Uncategorizedjeff

image

image

Except for a few small items, K&M Builders finished their part of the construction today.  All of the exterior is done.  Thank you to the crew that did a great job.

View from HMC silo

September 16, 2014Uncategorizedjeff

image

Pulling main power wires

September 16, 2014Uncategorizedjeff

image

Tank framed in

September 15, 2014Uncategorizedjeff

Installing garage doors

September 15, 2014Uncategorizedjeff

image

image

Observation windows installed

September 12, 2014Uncategorizedjeff

image

image

Installing the tank

September 10, 2014Uncategorizedjeff

image

image

New asphalt for feed storage

September 10, 2014Uncategorizedjeff

image

The bulk tank is here

September 8, 2014Uncategorizedjeff

image

It came from Russell Horst’s farm, where we bought it at auction.

I was here

September 5, 2014Uncategorizedjeff

image

Posts navigation

← Older posts
Newer posts →

Tags

VMS 2014
Proudly powered by WordPress