Installing flush pipes

August 12, 2014Uncategorizedjeff

image

image

 

image

image

Starting the lagoon

August 8, 2014Uncategorizedjeff

image

image

image

Curbs poured for utility room walls

August 8, 2014Uncategorizedjeff

image

Prepping for wider silage pad

August 8, 2014Uncategorizedjeff

image

Ready to start the lagoon

August 8, 2014Uncategorizedjeff

image

image

Second alley and crossovers poured today

August 6, 2014Uncategorizedjeff

image

Manure pipe

August 5, 2014Uncategorizedjeff

image

The manure drops were formed by cutting 5 of every 6 ribs out of the 22″ double wall pipe, and then forming concrete down to the opening.

image

image

Pouring the utility room floor

August 5, 2014Uncategorizedjeff

image

First alley

August 1, 2014Uncategorizedjeff

image

Pouring the feed alley

August 1, 2014Uncategorizedjeff

image